planning, permitting & compliance

Strategy

Approvals come down to: the story you’re telling, the data backing it up and the relationships you build.

Our strategies anticipate problems, align stakeholders and structure everything so your project doesn’t get stuck in the system. 

Roadmap

From zoning analysis and policy interpretation to pre-application strategy and submission package, we don’t just prepare documents. We design a pathway. This starts with mapping out who actually influences your file. We identify bottlenecks. We build submissions that tell the right story to reviewers and council. 

Outcome

Every step in our process is built to move you closer to approval. 

Predictable timelines, fewer surprises and a clear path from concept to construction. 

Our process brings transparency and alignment between stakeholders, reducing the risk of conflict.

100% first appeal avoidance

30% faster review timelines

Every permitting journey is different, but our process follows a clear rhythm:

  1. Discovery: Clarify your site context, constraints, and goals.
  2. Strategy: Identify the right pathway — Land Use, DP, or both.
  3. Preparation: Coordinate technical studies and prepare clean, complete submissions.
  4. Engagement: Build alignment among community, administration, and Council.
  5. Approvals: Track progress, respond to development authority feedback, attend and present at hearings and technical reviews, and see it through to approval.

This approach minimizes surprises and builds confidence — both for our clients and for technical reviewers.

For Developers and Architects

Our team has experience managing applications across various contexts, in developing/suburban and inner-city/urban areas, including projects without updated policy frameworks (such as Area Redevelopment Plans or Local Area Plans) in place. We help you navigate policy ambiguity, technical feedback, and stakeholder politics — ensuring your file stays on track from pre-application to approval.

Yes — through our hive of trusted technical partners, we coordinate all the supporting studies your project may need. These can include geodetic surveys, traffic impact or parking studies, environmental site assessments, geotechnical reports, development site servicing plans, and qualitative cost surveys, among others.

We’ll advise you on which studies are required, provide separate quotes from our partner consultants, and coordinate their completion as part of your overall permitting or rezoning process.

First, to be clear on terminology, a Restrictive Covenant is a legal rule, also known as a “caveat”, written into a property’s land title that limits how the land can be used or built on — for example, it might say “only single-detached homes are allowed” or “no secondary suites permitted.”

While these covenants appear on your title, it’s important to know that the City of Calgary (and other municipalities) do not enforce or remove them. Restrictive Covenants fall under provincial jurisdiction, meaning they are enforced or removed through the Courts, not through City approvals or rezoning processes.

If a covenant is in place, there are generally three pathways forward:

1. Legal Removal: Apply to the Alberta Court of King’s Bench to have the covenant formally discharged.

2. Negotiated Release: In some cases, the original parties (or their successors) can agree in writing to remove it.


 

Practical Reality: Removing a Restrictive Covenant 

Theoretically possible:

· A Restrictive Covenant can be removed through mutual agreement — if all original parties (or their successors) who benefit from the covenant consent in writing.

· This written agreement can then be registered at Land Titles to formally discharge the covenant. 

In practice:

· This only works when very few parcels are involved and all owners are known and cooperative.

· Most older covenants benefit many surrounding lots, meaning every current owner would need to sign off — which is usually impossible to coordinate.

· If some owners can’t be found or refuse to consent, the only remaining path is a Court application (under Alberta’s Land Titles Act, s.48). 

What we recommend: 

Hive reviews each covenant to see if a negotiated release is realistic. If not, we’ll guide you toward the path of least resistance — whether that’s a legal discharge through the Courts or a rezoning strategy that acknowledges and mitigates the risk.


 

3. Rezoning “Work-Around”: Proceed with a rezoning or development application recognizing that the covenant remains on title — this can sometimes be done if the covenant is outdated or not actively enforced, though it carries some risk.


 

Practical Reality: The Risk of a Rezoning “Work-Around”  

Theoretically possible:

· You can apply to rezone or redevelop a property even if a Restrictive Covenant is still on title.

· The City of Calgary (and other municipalities) typically won’t block your application because they don’t enforce covenants — they deal only with planning policy and bylaws.  

In practice:

· The covenant still exists on title, so a benefiting landowner could take you to Court to enforce it, even after you’ve received City approval.

· Lenders or insurers may treat the covenant as a title defect, slowing financing or requiring it to be removed first.

· Council or community groups might question the project’s legitimacy if they discover the covenant during public hearings. 

What we recommend: 

Hive helps clients weigh the level of risk before deciding. If a work-around makes sense — for example, when a covenant is outdated or rarely enforced — we’ll:

· Confirm the Municipality recognizes it as outside its jurisdiction,

· Advise you on disclosure and documentation, and

· Coordinate with your legal and financial teams to minimize risk. 


Our goal is to help you choose the path of least resistance that fits your project’s timeline and risk comfort.

Utimately, we assess the specific context of your property and recommend the path of least resistance — balancing your goals, project timelines, and risk tolerance.

Depending on the situation, we’re happy to work with you on whichever option best fits your needs.

 

No — rezoning to a Direct Control District does not remove a Restrictive Covenant. Unfortunately, this is a misconception we come across often these days.

A DC District is a Municipal zoning tool; a Restrictive Covenant is a provincial title restriction. They operate independently — rezoning can’t override private title agreements. The covenant remains in effect until it’s formally discharged through the Courts or released in writing by all benefiting landowners.


Practical Reality:

· A DC District gives planning flexibility, not title clearance.

· You could still face legal enforcement of the covenant.

Hive can help you assess whether removal is necessary or whether the covenant is functionally obsolete and low-risk to proceed around.

Think of planning as the what and how — it’s about aligning your project with zoning rules, policy frameworks, and City processes.
Engagement is the who and why — connecting with the individuals and groups your project affects in some manner so that outcomes work for everyone.

At Hive, we bridge both worlds. Our planners understand community dynamics, and our engagement specialists understand policy — so your project advances smoothly on all fronts.

It depends — but here’s what we typically see:

Project Type

Typical Duration

Why It Varies

Engagement Project

2–12 months

Desired outcomes, scale of community and the project, number of stakeholders, required levels of participation.

Permitting Project

6–14 months

Depends on the complexity of the proposal, as well as development authority queue times, public response, and political cycles. 

Feasibility Study

1–3 months

Depends on location, available data, consultant inputs, and scenarios tested.

We build schedules that fit your goals and realities — balancing thoroughness with momentum, so you can move forward with clarity and confidence.

🏗️ For Developers and Architects

Rezoning timelines depend heavily on site context. For example:

  • Land Use Redesignation (LOC): typically 6–9 months from submission to Council hearing, unless the site is in a highly activated community, or the site has special characteristics (e.g. a Heritage designation/resource) in which case the process could be 9-18 months. 
  • Concurrent LOC + DP: can take 9-20 months, depending on complexity and circulation feedback.
  • DP-only (approved land use): averages 4–6 months, depending on revisions.

We keep your file moving by proactively coordinating with City reviewers and reducing back-and-forth as much as possible. 